1. Base material: cement base material needs to
be fully polished, remove the surface of the base material oil, dust, floating
ash, so that the cement structure layer exposed. The steel substrate needs to
be sandblasted to remove dirt and rust. The surface of the steel substrate can
be roughened so that there are enough physical riveting points between the
primer and the surface of the steel substrate.
2. Primer:polyurea enterprises have a special primer, such epoxy system.
Note that the primer should adhere well to both the substrate surface and the
polyurea coating. The surface drying time and physical properties of primer
have a great influence on the construction of spray polyurea.
3. Polyurea: different spraying polyurea is available according to different uses.
Name: Lily Lu
Mobile:86-13922763266
Tel:86-20-38993165
Whatsapp:86-13922763266
Email:lilylu@huisins.com
Add:Room 206, Building 21, LongTeng Xing Cheng, No.68 LongTeng South Road, DongXiao Town, XinLuo District, LongYan City, FuJian Province. China
We chat