lilylu@huisins.com     86-13922763266
  • Polyaspartic Water Park Elastic Varnish
  • Polyaspartic Water Park Elastic Varnish
  • Polyaspartic Water Park Elastic Varnish
  • Polyaspartic Water Park Elastic Varnish
Polyaspartic Water Park Elastic VarnishPolyaspartic Water Park Elastic VarnishPolyaspartic Water Park Elastic VarnishPolyaspartic Water Park Elastic Varnish

Polyaspartic Water Park Elastic Varnish

Description:

It is composed of polyaspartic acid ester resin, various additives, a small amount of solvent, isocyanate curing agent, etc.

All raw materials are produced by own. Component C is added to the anti-skid varnish according to the ratio provided.

Features and benefits:

● Good adhesion with polyurea.

● Excellent resistance to disinfectant water

● Simple construction and quick drying.

● Excellent weather resistance and skid resistance.

Design purpose: Mainly used for water park system waterproof coating, with good protective effect.

Typical physical and chemical properties:

Color

colorless clear liquid

Weight Solid

55%-60%

Flash point

30±2

Viscosity

1000±200CPS(25℃,two component mixing

Proportion

1.0±0.1g/cm3Mixing

Luster

Coating thickness

Dry Film60-80μm Wet film80120μm

Theoretical coating rate

Theoretical value:8/Kg/80μm

Actual value: Varies according to various factors such as surface treatment, external environment, construction method, etc.

Construction parameters:

Ratio

Scrape + roll:B: A: Thinner = 1:0.5:0.2-0.3 (no anti-slip effect)

Scrape + roll:B: A: C: Thinner = 20:10:1.2 (anti-slip effect type)

Coating available time

Temperature(℃)

5

10

20

25

Mixing(hrs)

90~110

70~90

50~60

40~50

Construction conditions:-15 ℃ ---30 ℃, humidity: ≤ 85%

Substrate temperature: must be greater than the air dew point temperature above 3 ℃.

Cleaning agent: Polyurea standard thinner

Drying time and coating interval:

Temperature ()

5

5

10

20

30

Touch dry(hrs)

4

2.5

2

1.5

1

Hard dry (hrs)

24

12

10

8

6

Coating interval (hrs)

48

24

20

16

12

The above data are for guidance only. Actual drying time / time interval before coating can be long or short, depending on film thickness, ventilation, humidity, lower paint, preloading requirements and mechanical strength.

Surface treatment:

1,Rinse with salt water and other water-soluble dirt

2,Remove grease with a suitable detergent and degreaser

3,Make sure the surface is clean and dry before construction

4,Note the distance between the coating and the primer

Store:

Storage time:  Paint(B): 1 year   Curing agent(A): 9 months

Storage temperature: 0 ℃ -30 ℃

Packing:Paint: 20KG   Curing agent: 20KG

CONTACT US

Name: Lily Lu

Mobile:86-13922763266

Tel:86-20-38993165

Whatsapp:86-13922763266

Email:lilylu@huisins.com

Add:Room 206, Building 21, LongTeng Xing Cheng, No.68 LongTeng South Road, DongXiao Town, XinLuo District, LongYan City, FuJian Province. China