lilylu@huisins.com     86-13922763266
  • Polyaspartic High solids Elastic Waterproof coating
  • Polyaspartic High solids Elastic Waterproof coating
Polyaspartic High solids Elastic Waterproof coatingPolyaspartic High solids Elastic Waterproof coating

Polyaspartic High solids Elastic Waterproof coating

Product introductionHA8500 is consist of Polyaspartic esters and variety of pigment, filler,additive ,solvent and MDI. All main ingredients are manufactured by own.

Characteristic

■ Thick film construction, filming more than 500μm at a time

■ Great adhesion with epoxy primer and polyurea topcoat

■ Excellent elongation and Tensile strengt

■ Simple construction and quick drying

Application For the waterproofing and anti-corrosion to concrete substrate(basement, bridge, roof, warehouse, water park),foam, plastic and other substrates; for waterproofing and anti-corrosion of buried steel structure outer layer.

Physical Parameters

Color:white

Weight Solid:≥95%

Flash point:30±2℃

Viscosity:1000±200CPS(25℃)

Proportion:1.1±0.05g/cm3

Luster:Half-light or bright

Coating thickness:Dry Film:500-600   Wet film:560-680μm

Theoretical coating rate:Theoretical value:1.8㎡/Kg/500μm

Actual value:varies according to various factors such as surface treatment, external environment, construction method, etc.

Main Technical indicators of Coating Film

Elongation:≧300%                                    test method:GB/T 16777-2008

Tensile Strengt:≧10MPa                           test method:GB/T 16777-2008

Tear strength N/mm:≧60                           test method:GB/T 529-2008

Adhesion (concrete):≧4 MPa                    test method:GB/T 5210-2006

Abrasive resistance(1000g/500r)):≦40   test method:GB/T 1768-2006

Construction parameters

Ratio:

Brush:Main paint: curing agent: thinner=1:0.8:0-0.1

Coating available time:

Temperature(℃

5

10

20

25

Mixing(hrs)

80~90

60~80

40~60

30~40




Construction conditions: -15 ℃ -30 ℃, humidity: ≤ 85%

Substrate temperature: must be greater than the air dew point temperature above 3 ℃

Construction method

Airless spraying, brushing Recommended Use

Airless spray (two-component)

Nozzle Size

0.0210.023

Outlet pressure

100120kg.cm3

Dilution ratio

5%

Cleaning agent / thinner:Polyurea standard thinner

Note: If you use airless spray or roller coating, please consult our engineers before use.

Drying time and coating interval:

Temperature(℃)

5

5

10

20

30

Touch dry(hrs)

6

3

2.5

2

1.5

Hard dry (hrs)

24

12

10

8

6

Painting interval(hrs)

48

24

20

16

12

The above data are for guidance only. Actual drying time / time interval before coating can be long or short, depending on film thickness, ventilation, humidity, lower paint, preloading requirements and mechanical strength.

Painting matching

Applicable under coat: epoxy primer, polyurea coating, or refer to our recommended package

Applicable top coating: polyaspartic polyurea topcoat

Surface treatment:

1,Rinse with salt water and other water-soluble dirt

2,Remove grease with a suitable detergent and degreaser

3,Make sure the surface is clean and dry before construction

4,Note the distance between the coating and the primer

store:

Storage time: Paint:1 year   Curing agent: 9 months

Storage temperature: 0 ℃ -30 ℃

Packing:Paint: 20KG  Curing agent: 20KG

CONTACT US

Name: Lily Lu

Mobile:86-13922763266

Tel:86-20-38993165

Whatsapp:86-13922763266

Email:lilylu@huisins.com

Add:Room 206, Building 21, LongTeng Xing Cheng, No.68 LongTeng South Road, DongXiao Town, XinLuo District, LongYan City, FuJian Province. China