Product introduction:It is consist of Polyaspartic esters and variety of pigment, filler,additive ,solvent and MDI. All main ingredients are manufactured by own.
Characteristic:
■ Non-solvent products; green
■ Thick film construction, filming more than 500μm at a time
■ Great adhesion with concrete substrate
■ Excellent elongation and Tensile strength
■ Simple construction and quick drying
Application: For the waterproofing and anti-corrosion to concrete substrate(basement, bridge, roof, warehouse, water park),foam, plastic and other substrates; for waterproofing and anticorrosion of buried steel structure outer layer.
Product Specification:
Color: Customized according to customers
Solid content by weight:≥98±2%
Flash point: 98±2℃
Viscosity: 6000±200CPS (25℃,A,B components combined)
Density: 1.15±0.05g/cm3
Gloss: Bright light
Film thickness(μm): Dry:500-600 Wet:560-680
Theoretical coverage:1.23 Sqm/Kg/100μm
Actual value:Related to surface treatment, external environment,application method and other factors.
Elongation:≧350% test method:GB/T 16777-2008
Tensile strength: 11-13MPa test method:GB/T 16777-2008
Tear strength N/mm:≧30 test method:GB/T 529-2008
Adhesion(concrete):≧2 MPa test method:GB/T 5210-2006
Abrasion resistance(1000g/500r)):≦40 test method:GB/T 1768-2006
Low temperature bending(-35℃):No crack test method:GB/T 16777-2008
Application paramether:
ratio: Brush:B:A:thinner=1:0.8:0-0.1(by weight)
Working time:
Temperature(℃) |
5 |
10 |
20 |
25 |
Working time(min) |
80~90 |
60~80 |
40~60 |
30~40 |
Condition:
Environment temperature: 5℃---30℃, Environment moisture:≤85%(RH)
Substrate temperature: 3℃ higher than air dew pint
Construction method:roller (Recommend)
Thinner:Standard Polyaspartic thinner
Noted:Prior to apply by airless spary or roller, please consult our engineer.
Drying time and application interval:
Temperature(℃) |
-5 |
5 |
10 |
20 |
30 |
Touch dry(hrs) |
6 |
5.5 |
5 |
2 |
3 |
Hard dry(hrs) |
24 |
16 |
12 |
8 |
8 |
interval(hrs) |
48 |
24 |
20 |
16 |
12 |
The above data are for guidance only. Actual drying time / time interval before coating can be long or short, depending on film thickness, ventilation, humidity, lower paint, preloading requirements and mechanical strength.
Matched paint:
Applicable under coat: epoxy primer, polyurea coating, or refer to our recommended package
Applicable top coat: polyaspartic polyurea topcoat
Surface treatment:
l Rinse with salt water and other water-soluble dirt
l Remove grease with a suitable detergent and degreaser
l Make sure the surface is clean and dry before construction
l Note the distance between the coating and the primer
Storage:
Shelf life: Component B:1 year Component A:9 months
Storage temperature: 0℃-30℃
Package:Component B:20KG Component A:16KG
Name: Lily Lu
Mobile:86-13922763266
Tel:86-20-38993165
Whatsapp:86-13922763266
Email:lilylu@huisins.com
Add:Room 206, Building 21, LongTeng Xing Cheng, No.68 LongTeng South Road, DongXiao Town, XinLuo District, LongYan City, FuJian Province. China
We chat